{"title":"Rig Assembly Instructions","description":"\u003cdiv class=\"border-hh row-fluid\"\u003e\r\n\u003ch1\u003eRig Instructions\/Assembly Guidelines\u003c\/h1\u003e\r\n\u003cp\u003eFor Exploded Diagram on FreeStanding Rigs, \u003ca href=\"https:\/\/www.dropbox.com\/s\/nnaeqkxq860fevy\/FreestandingTitanRigs.pdf?dl=0\" target=\"_blank\"\u003eClick here\u003c\/a\u003e\u003c\/p\u003e\r\n\u003c\/div\u003e\r\n\u003cdiv class=\"bottom-hh row-fluid\"\u003e\r\n\u003cp style=\"color: #444;\"\u003eConcrete anchors for the ground are provided inside the packages of the uprights tubes. Please check through entire tube for concrete anchors\u003cbr\u003e Concrete anchors for the wall are NOT included. Wall mount holes on the pullup bars are 13.5mm and will need to be purchased separately\u003cbr\u003e If you need a diagram of the rig you ordered, please e-mail your sales rep directly or e-mail Sales@GetRXd.com\u003cbr\u003e\r\n\r\n\u003cbr\u003e \u003cstrong\u003e Assembly Tools: \u003c\/strong\u003e\r\n\u003cbr\u003e Titan Rig – ¾ Ratchet + 10mm Allen Wrench\r\n\u003cbr\u003e Anchoring for either Rigs: Rotary Hammer or Hammer Drill with a 5\/8th drill bit\u003cbr\u003e\r\n\u003cbr\u003e Pull-Up Bars and CrossBars are 1080mm length (4') or 1800mm length (6')\r\n\u003cbr\u003e Wall Mount holes: 13mm diameter\r\n\u003cbr\u003e Floor Anchor Upright Holes: 5\/8\" \u003c\/p\u003e\r\n\r\n\r\n\u003cp style=\"color: #444;\"\u003e\u003cbr\u003e \u003cstrong\u003e General Assembly Guidelines \u003c\/strong\u003e\r\n\r\n\u003cbr\u003e The holes of the uprights where pull-up bars bolt into are offset. If you are using the upper-most holes on one upright, then you should use the upper-most hole on the connecting upright as well. Examine the uprights and make sure that you are lining up the correct holes for each pull-up bar. \r\n\r\n\u003cbr\u003e\r\n\u003cbr\u003e \r\n\u003cstrong\u003eTighten like you would a Tire:\u003c\/strong\u003e\r\n\u003cbr\u003eDo not tighten the nuts and bolts flush until the end of the assembly. You should leave everything loose until everything is lined up and pieces are put together. When the Rig is assembled with the bolts\/nuts still loose, go back and tighten all nuts and bolts by starting from middle section of rig and work your way outwards.\u003cbr\u003e\u003cbr\u003e \r\n\r\n\r\n\u003cstrong\u003e If you are assembling Elevation Ramps or Height Extensions to your rig: \u003c\/strong\u003e\u003cbr\u003e Start with the tallest section of the Rig: \u003cbr\u003e Install the extension tube\/height extensions (EUT) into the upright first\u003cbr\u003e Second, work on areas that connect crossbar-to-upright-to-ramps. Ramps can share the top hole with square crossbars.\u003cbr\u003e When installing crossbar-to-upright-to-ramp sections, feed the bolt through the crossbar, then through the upright, then screw the bolt into the ramp.\u003cbr\u003e Once you install the extensions and configure crossbar-to-upright-to-ramp sections, you can start connecting the middle of your rig with pull-up bars or monkey bars. We suggest only hand tightening bolts and nuts until the entire structure is configured. Once entire unit is configured, you can go back and tighten everything down!\u003cbr\u003e\u003cbr\u003e \u003cstrong\u003e Rig Anchor Clip: \u003c\/strong\u003e\u003cbr\u003e \u003ca href=\"https:\/\/www.youtube.com\/watch?v=AR5x3w1W_MM\" target=\"_blank\"\u003eClick here for rig anchoring instructions with Get RXd provided concrete anchors\u003c\/a\u003e \u003cbr\u003e Anchoring the Rig will be the last step of the process. Once you’ve found the ideal location for the Rig, you’ll then be able to use the anchors provided to anchor the Rig to the ground.\u003cbr\u003e\u003cbr\u003e You’ll need to purchase a 5\/8” drill bit to drill the appropriate size hole for the anchor\u003cbr\u003e Rotary Hammers\/Hammer Drills can be rented from your local hardware store.\u003c\/p\u003e\r\n\u003c\/div\u003e","products":[],"url":"https:\/\/getrxd.com\/collections\/rigassemblyinstructions.oembed","provider":"Get Rxd","version":"1.0","type":"link"}